| Most viewed - Construction Pictures 2006-2009 |

3/20/07 - Main Building572 views
|
|

3/22/07 - Main Building572 viewsLobby Roof.
|
|

5/1/07 - Main Building572 views
|
|

12/14/06 - Main Building571 views
|
|

1/15/07 - Main Building571 views
|
|

2/22/07 - Colonial571 viewsNew staircase going up to the second floor.
|
|

2/22/07 - Colonial571 viewsBasement.
|
|

5/11/07 - Main Building571 viewsSome of the groundwork in front of the Main Building.
|
|

2/1/07 - Main Building570 views
|
|

2/22/07 - Main Building570 viewsStanding between the Masmidim Bais Medrash and the Main Building.
The doors on the Second Floor on the left are going in to the Masmidim Dining Room. The door on the right goes in to the Mechina Weekend Dining Room.
|
|

2/22/07 - Main Building569 viewsStanding in front of the Masmidim Bais Medrash, looking towards the Main Building.
|
|

4/17/07 - Main Building569 viewsStanding in the Main Office looking towards Meir's office.
|
|

1/10/07 - Bais Rephael568 viewsThe Bais Rephael (Old Social Hall) being leveled.
|
|

2/22/07 - Main Building568 viewsThe Bakery.
|
|

11/30/06 - Colonial567 views
|
|

2/22/07 - Colonial567 viewsNew Basement hallway.
|
|

3/1/07 - Bais Rephoel567 views
|
|

5/1/07 - Main Building567 viewsThe Fleishig Kitchen.
|
|

5/11/07 - Main Building567 views
|
|

5/11/07 - Main Building567 viewsThe Game Room.
|
|

1/16/07 - Main Building566 views
|
|

1/30/07 - Main Building566 views
|
|

Main Building - 1/31/07566 views
|
|

2/22/07 - Main Building566 viewsLooking down the hallway outside of the kitchen.
The doorway on the left goes to the Guest Dining Room. The doorways on the left after that go to the Main Dining Room. At the end of the hall is the Mechina Weekend Dining Room. If you make a right at the end of the hall, you enter the Masmidim Dining Room.
The windows and doors on the right are for the kitchen.
|
|

3/26/07 - Main Building566 viewsLand being cleared in front of the Main Building.
|
|

5/16/07 - Main Building566 viewsThe Main Lobby - looking towards the office.
|
|

12/14/06 - Main Building565 views
|
|

12/28/06 - Main Building565 views
|
|

1/10/07 - Main Building565 views
|
|

5/11/07 - Main Building565 viewsThe retaining wall by the loading dock.
|
|

12/28/06 - Main Building564 views
|
|

1/30/07 - Main Building564 views
|
|

2/12/07 - Main Building564 views
|
|

2/22/07 - Main Building564 viewsPay phone, lost and found, etc. area.
|
|

3/30/07 - Main Building564 viewsPart of the Lobby.
|
|

5/11/07 - Main Building564 views
|
|

4/8/08 - Shul564 views
|
|

1/11/07 - Main Building563 views
|
|

2/22/07 - Main Building563 views
|
|

5/1/07 - Main Building563 viewsThe Kitchen equipment waiting to be installed.
|
|
| 831 files on 21 page(s) |
 |
 |
 |
 |
 |
 |
 |
18 |  |
 |
|