| Most viewed |

1/30/07 - Main Building504 views
|
|

3/30/07 - Main Building504 viewsPart of the Lobby.
|
|

5/1/07 - Main Building504 viewsThe Fleishig Kitchen.
|
|

5/11/07 - Main Building504 views
|
|

504 views
|
|

504 views
|
|

2/22/07 - Main Building503 viewsStanding between the Masmidim Bais Medrash and the Main Building.
The doors on the Second Floor on the left are going in to the Masmidim Dining Room. The door on the right goes in to the Mechina Weekend Dining Room.
|
|

5/18/07 - Main Building503 viewsThe retaining wall by the loading dock.
|
|

503 views
|
|

503 views
|
|

1/30/07 - Main Building502 views
|
|

2/22/07 - Main Building502 viewsPay phone, lost and found, etc. area.
|
|

5/1/07 - Main Building502 viewsThe Kitchen equipment waiting to be installed.
|
|

5/11/07 - Main Building502 views
|
|

4/8/08 - Shul502 views
|
|

502 views
|
|

502 views
|
|

502 views
|
|

502 views
|
|

502 views
|
|

502 views
|
|

2/13/07 - Main Building501 views
|
|

5/1/07 - Main Building501 viewsStanding by the Guest House looking towards the land that is being leveled and graded for the Main Building.
|
|

5/13/07 - Main Building501 viewsThe grass (hay) being watered.
|
|

501 views
|
|

501 views
|
|

12/12/06 - Main Building500 views
|
|

1/3/07 - Main Building500 views
|
|

2/22/07500 views
|
|

3/26/07 - Main Building500 viewsThe Hallway outside the Kitchen. The doors on the left are for the Kitchen and the doors on the right are for the Dining Room.
|
|

5/11/07 - Main Building500 viewsThe retaining wall by the loading dock.
|
|

1/15/07 - Main Building499 views
|
|

2/22/07 - Colonial499 viewsThird Floor.
|
|

3/9/07 - Main Building499 views
|
|

499 views
|
|

1/10/07 - Bais Rephael498 viewsThe Bais Rephael (Old Social Hall) being leveled.
|
|

1/16/07 - Main Building498 views
|
|

2/20/07 - Main Building498 views
|
|

3/26/07 - Main Building498 viewsMain Dining Room.
|
|

498 views
|
|
| 1897 files on 48 page(s) |
 |
 |
 |
 |
 |
40 |  |
 |
 |
 |
|