| Most viewed |

9/27/06 - Chof Ches564 views
|
|

10/31/2006564 viewsThe tractor shed being dismantled.
|
|

11/30/06 - Colonial564 views
|
|

11/30/06 - Main Building564 views
|
|

564 views
|
|

1/11/07 - Bais Rephael564 viewsThe Bais Rephael (Old Social Hall) being leveled.
|
|

2/1/07 - Main Building564 views
|
|

3/1/07 - Main Building564 views
|
|

564 views
|
|

10/31/2006563 viewsThe view from the 3rd floor of the Colonial.
|
|

12/29/06 - Main Building563 views
|
|

4/17/07 - Main Building563 viewsStanding near the guest house looking towards lobby.
|
|

563 views
|
|

11/30/06 - Colonial562 views
|
|

562 views
|
|

2/22/07562 views
|
|

4/26/07562 viewsThe trailers being moved to the loading dock so that the kitchen can be unloaded.
|
|

11/30/06 - Bunk Chof Vov561 views
|
|

11/30/06 - Bunk Chof Zayim561 views
|
|

5/28/2010561 viewsBungalows that are being constructed by Nesivos Hatalmud.
|
|

561 views
|
|

9/27/2006560 views
|
|

8/23/06560 viewsThe tent - mostly empty.
|
|

1/24/07 - Bais Rephael (Old Social Hall)560 views
|
|

1/25/07 - Main Building560 views
|
|

560 viewsThe new staircase, between the first and second floors.
|
|

2/22/07560 views
|
|

2/22/07560 views
|
|

3/14/08560 viewsThe Shul, being extended.
|
|

560 views
|
|

4/30/2010560 viewsThe driveway being built.
|
|

559 views
|
|

12/19/06 - Main Building559 views
|
|

5/28/2010559 viewsBungalows that are being constructed by Nesivos Hatalmud.
|
|

8/24/06558 viewsThe Air Conditioning being removed.
|
|

8/24/06558 viewsNo Freezer!
|
|

2/14/07 - Main Building558 views
|
|

2/22/07558 views
|
|

3/1/07 - Main Building558 views
|
|

4/30/2010558 viewsThe driveway being built. This is for bungalows that are being constructed by Nesivos Hatalmud, a yeshiva that will be in Camp Agudah for the summer.
|
|
| 1897 files on 48 page(s) |
 |
 |
 |
 |
 |
17 |  |
 |
 |
 |
|