Most viewed - May 2007 |
5/1/07 - Colonial311 viewsColonial - Maintenance Complex.
|
|
5/1/07 - Main Building254 viewsKitchen Loading Dock.
|
|
5/28/07 - Main Building252 viewsLandscaping being started.
|
|
5/1/07 - Main Building221 viewsThe Main Lobby doors are being installed.
|
|
5/22/07 - Main Building208 views
|
|
5/28/07 - Main Building198 views
|
|
5/1/07 - Main Building197 viewsStanding on the 3rd floor of the Colonial looking towards the Kitchen Loading Dock.
|
|
5/1/07 - Main Building197 viewsThe Masmidim Dining Room.
|
|
5/16/07 - Main Building197 viewsThe Main Lobby Windows - being installed.
|
|
5/1/07 - Main Building192 viewsStanding on the 3rd floor of the Colonial looking towards the entrance to camp. The kitchen loading dock is on the left.
|
|
5/1/07 - Main Building191 viewsStanding by the Guest House looking towards the Main Building and Colonial.
|
|
5/28/07 - Main Building191 views
|
|
5/28/07 - Main Building189 views
|
|
5/1/07 - Main Building185 viewsStanding on the 3rd floor of the Colonial looking towards the front of the Main Building.
|
|
5/1/07 - Main Building182 viewsPart of the roof of the Main Building.
|
|
5/11/07 - Colonial182 views
|
|
5/1/07 - Main Building181 viewsLooking towards the Mechina and Masmidim Dining Room (Upper Level). The entrance to the Mechina Bais Medrash, Game Room, and Rabbi Belsky's Shiur room, are on the Lower Level.
|
|
5/28/07181 viewsThe Office Trailer being removed.
|
|
5/1/07 - Main Building180 viewsThe door on the left goes into the GDR. The two white doors go into the kitchen.
|
|
5/1/07 - Main Building180 viewsThe Main Lobby doors are being installed.
|
|
5/1/07 - Colonial179 viewsColonial - 1st Floor Hallway.
|
|
5/1/07 - Main Building178 viewsStanding inside the Main entrance, looking towards the Colonial.
|
|
5/28/07177 viewsThe Office Trailer - gone.
|
|
5/1/07 - Main Building175 viewsOutside the office.
|
|
5/28/07175 viewsThe Office Trailer being removed.
|
|
5/1/07 - Main Building174 viewsStanding by the Guest House looking towards the Main Building.
|
|
5/1/07 - Main Building173 viewsOutside, on the side of the Main Dining Room.
|
|
5/1/07 - Colonial172 viewsColonial 3rd floor hallway.
|
|
5/28/07170 views
|
|
5/1/07 - Main Building169 viewsStanding by the Guest House looking towards the land that is being leveled and graded for the Main Building.
|
|
5/28/07 - Main Building169 views
|
|
5/28/07 - Main Building168 views
|
|
5/28/07166 viewsThe Office Trailer being removed.
|
|
5/1/07 - Colonial165 viewsColonial Staircase between the first and second floor.
|
|
5/28/07 - Main Building165 views
|
|
5/1/07 - Main Building164 views
|
|
5/1/07 - Main Building164 viewsThe Kitchen equipment waiting to be installed.
|
|
5/28/07 - Main Building162 views
|
|
5/1/07 - Main Building161 viewsLooking towards the GDR windows.
|
|
5/11/07 - Colonial157 viewsThe retaining wall by the colonial.
|
|
129 files on 4 page(s) |
1 |
|
|