Home Login
Album list Last uploads Last comments Most viewed Top rated My Favorites Search
Home > 2006-2009 > Construction Pictures 2006-2009 > February 2007
2/22/07 - Main Building
Standing between the Masmidim Bais Medrash and the Main Building.
The doors on the Second Floor on the left are going in to the Masmidim Dining Room. The door on the right goes in to the Mechina Weekend Dining Room.

2/22/07 - Main Building

Standing between the Masmidim Bais Medrash and the Main Building.
The doors on the Second Floor on the left are going in to the Masmidim Dining Room. The door on the right goes in to the Mechina Weekend Dining Room.

M332.jpg M333.jpg M334.jpg M335.jpg M336.jpg